Catalogue · Instruments

Spectroscopy

UV-visible and visible spectrophotometers, from single-beam teaching instruments to double-beam and PMT-detector research models.

20 categories · 244 published records. The catalogue we can supply is broader than the catalogue we publish — send us the item if you cannot find it.

Before you order

The choice that matters is single beam against double beam. A single-beam instrument measures the reference and the sample at different moments, so lamp drift lands directly in the result — fine for a fixed-wavelength assay read within a minute of blanking, and a poor foundation for a scan or a kinetic run. Double beam splits the light and cancels the drift. Spectral bandwidth is the second figure to read: a pharmacopoeial identification test that specifies a bandwidth cannot be closed out on an instrument with a wider one, whatever its wavelength range says.

Related

What laboratories usually order alongside this.

Chromatography

HPLC and GC systems, autosamplers, column ovens, and the gas generators and vacuum pumps that support them.

Analytical Instruments

Balances, pH and conductivity meters, spectrophotometers, titration apparatus, extraction and digestion systems.

Physical Property Testing

Viscometers, polarimeters, refractometers, density meters and melting point apparatus.

Why we publish the standard revision, not just the number.

Testing instruments are bought against a method, and a method is written against a standard. When that standard is revised, the old number stays in circulation for years — sometimes decades — because catalogues copy each other and nobody re-checks.

Three examples currently live across this industry: ASTM D1559 for Marshall stability, withdrawn in 1998. ASTM D422 for hydrometer analysis, withdrawn in 2016. IS 13311 for non-destructive concrete testing, absorbed into the IS 516 family in 2018. All three still appear on product listings you can buy from today.

That matters commercially, not just pedantically. If your quality manual cites a withdrawn standard, a NABL assessor will raise it, and the fastest way that error enters a manual is by being copied off a supplier’s specification sheet.

On qualification: for pharmaceutical customers, the documentation is half the purchase. GMP-specification equipment differs in its contact surfaces, its control system, its printed cycle records and its IQ/OQ/PQ protocol set. Specify that requirement at enquiry stage — retrofitting it after installation costs more and delays qualification.

On site preparation: compression testing machines, ductility baths, abrasion machines and large ovens need foundations, three-phase supply, drainage or extraction. We issue the foundation drawing and utility schedule with the quotation so the civil work can run in parallel with the delivery lead time rather than after it.